SurveyingCivil Engineering

WORK FROM WHOLE TO PART

  • It is the first principle of surveying.
  • By this principle, it means that the surveyor should first establish the large frame work consisting of main control points, accurately.
  • In between the large frame work so established, subsidiary small frame works can be established by a relatively less accurate survey. By doing so, the errors in small frame work get localized and are not magnified and thus the accumulation of errors gets confined.
  • In the reverse process of working from part to whole, small errors get magnified due to accumulation of errors from small frame work to large frame work.

Locate a point by atleast two measurements

  • According to this principle, the new point (station) should always be fixed by atleast two measurements (linear or angular) from a fixed reference point.
  • Take two control points A and B and the distance between them is accurately measured. By using A and B, two control points whose positions are already known on the plan, the position of C can be plotted by any of the following methods:

surveying

location of unknown point

<< Previous | Next >>

WhatsApp Group Join Now
Telegram Group Join Now

Leave a Reply

Your email address will not be published. Required fields are marked *